Overview
A CAPEX request expresses a need for works on a building before it becomes a works project (CAPEX). It is entered, submitted for approval and, once approved, it automatically creates the corresponding CAPEX.
What CAPEX requests cover
A dedicated tab on the building, with the list of requests and their associated CAPEX.
A detail page per request: category, description, units, obsolescence, documents, ESG criteria, amount, targeted realization year, items split.
An approval workflow that follows the building's CAPEX request approval matrix.
The creation of the CAPEX on approval, then its update at each new approval of the request.
Select a step from the list below.

The CAPEX requests tab
CAPEX requests are managed building by building, in the CAPEX requests tab of the building page (between Tenant's expenses and Works).
When is the tab visible?
The module is enabled for your environment.
You have the right to view CAPEX requests.
The building is the actual building (master): the tab does not exist on a scenario, a snapshot or a stress test.
The list of requests
The table CAPEX requests list shows one row per request:
Column | Content |
Title | Request name. |
Category | Category code and name. |
Amount (excl. tax) | Request amount. |
Date | Targeted realization year, or “first – last” year if the amount is split. |
Status | Status of the request (step “Request statuses”). A Draft ready to be submitted is shown in green. |
Works | Link to the CAPEX created on approval. |
Works status | CAPEX status, completed with the CAPEX submission type where applicable. |
Works amount (excl. tax) | CAPEX amount, with the Validated budget below it (amount of the first approved submission of the CAPEX). |
All columns can be sorted and filtered ( Search field). The filter of the column Status offers Draft, Submitted, Approved and Dropped.
The buttons
Add a request: opens the creation screen.
Multiple submissions: submits several drafts at once (step “Submit a request”). Visible as soon as a request is ready to be submitted.
Clicking a row shows Details, Edit and Delete, depending on your rights.

Create a request
Click Add a request in the CAPEX requests tab of the building. The New request screen opens, with a read-only Site card at the top (operation site, ID, address, construction date).
General information
Field | Entry |
Operation label | 40 characters maximum. Optional: if left empty, the request takes the name of its detailed category. |
Nature / Detailed category | CAPEX category of the request, on two levels. |
Creation date | Today's date, cannot be changed. |
Status | “New request”. |
Request detail
Field | Entry |
Additional fields | Fields specific to your environment, if any exist for CAPEX requests. |
Detailed description | Free text. |
Equipment obsolescence | List configured per environment. |
Units | Units of the building concerned (multiple choice). |
Comments | Free text. |
Documents | Document upload (location photo, location plan, other documents), depending on your document rights. |
Sustainable development
ESG: Environment, Social, Governance (multiple choice).
Taxonomy?: Yes, No or Information not available.
The Budget and the Items split are detailed in the next step.
Save
Save and continue saves the request in Draft status and opens its detail page.
Cancel creation discards the entry, after confirmation: “Are you sure you want to cancel the creation?”
Only the Amount (excl. tax) and theTargeted realization year (or the split) are required to save: the rest can be completed before submission.

Budget and split
The Budget section holds the requested amount and its split over time. This is the amount that the approval workflow compares to the matrix thresholds, and that the CAPEX takes over on approval.
Field | Entry |
Amount (excl. tax) * | Required, in the currency of the building, two decimals at most. |
Recoverability percentage | From 0 to 100% (shortcut buttons 0 % and 100 %), 0 by default. Taken over by the CAPEX. |
Split costs over several years? | Checkbox. |
Targeted realization year * | Checkbox unticked: a single year, chosen from the current year and the following ones. The whole amount is placed in it. |
Split | Checkbox ticked: one amount + year row per year, button Add a period. |
Split checks
“Please indicate at least two periods for the split”
“Total of split amounts must be equal to total cost.”
“Two similar periods are used in the split.”
Split amounts are entered without decimals.
Items split
The Items split breaks down the request amount by works item: columns Works package, Amount, Share (%), with a total. The button Add is enabled once the request amount is entered.
Window Create a works package: item (configured list), amount and percentage, and optionally start and end dates.
The total cannot exceed 100% (“The total exceeds 100%”).

Request statuses
The status of a request is shown in the list, in the breadcrumb and on the detail page.
Status | Means |
Draft | Request created, being entered, rejected by an approver or moved back to draft. It can be edited and submitted. |
Submitted | Request pending approval in the approval workflow. |
Approved | Request approved: the CAPEX is created or updated. If this CAPEX is dropped, the request shows “Dropped CAPEX project”. |
Dropped | Request dropped, with its decision date, its reason and its additional information. |
The status can be completed by a mention:
“pending approval {step}”: expected level of the matrix, when the matrix names its steps;
“changes request {step}”: the last submission was rejected;
“Re-submission pending after Asset approval”: the request has already been approved and then moved back to draft.
Detail page actions by status
Status | Available actions |
Draft | Submit the request, Drop the CAPEX request, Remove the request |
Submitted | Approver of the expected level: Approve the request, Request changes. Other users: Drop the CAPEX request; the submission is cancelled in the tab Submission. |
Approved | Move to draft, Drop the CAPEX request |
Dropped | Move to draft |

Submit a request
A request is submitted from its detail page, in Draft, using Submit the request. The Submission of the CAPEX request window opens.
Field | Role |
Submission type * | Displayed if submission types are configured; the first one is suggested. |
Hardcode required number of approvals / Number of approvals | Displayed if a matrix applies to the building and forcing is enabled. Forcing is only possible for a tenant program category (set to 1 by default); for an owner category, it is disabled. |
Comment | Free text, passed on to the approvers. |
Click Submit: the submission is recorded with the request amount, and the request enters the approval workflow (next step).
Multiple submissions
From the list, Multiple submissions opens the Submission of CAPEX requests window: submission type, comments, and the list of drafts to tick (Title, Amount, Date, Status). Click Save to submit the ticked requests.
Message if no row is ticked: “Please select at least one CAPEX request.”

The approval workflow
The approval workflow of a request follows the approval matrix of type CAPEX request linked to its building. There is no preference that enables or disables this workflow: only the building's matrix matters.
Matrix or no matrix
Building situation | On submission |
No CAPEX request matrix | The request goes directly to Approved and the CAPEX is created immediately. No approver is asked, no approval request e-mail is sent. |
Matrix whose calculation gives 0 levels (by default or through its thresholds) | Same result: immediate approval and CAPEX creation. |
Matrix with at least one level | The request goes to Submitted; the level 1 approvers are notified. |
The number of levels depends on the matrix rules, in particular the thresholds on the CAPEX request amount.
Approve or request changes
The approver of the expected level sees, on the detail page, Approve the request and Request changes. The window offers a Comment (optional) and the button Approve or Reject.
Decision | Effect |
Approve, levels remaining | The request stays Submitted; the next level approvers are notified. |
Approve, last level | The request goes to Approved; the CAPEX is created or updated. |
Reject (changes request) | The request goes back to Draft. A new submission restarts from level 1. |
Approvers can also decide from the Activities tab, table CAPEX requests I can approve; the window there also offers an Approval date.

Track and cancel a submission
The Submission tab of the detail page (left menu, next toInformation) tracks all submissions of the request.
Column | Content |
Submitted on / Submitted by | Date and author of the submission. |
Type | Submission type, if any. |
Status | In progress, Approved or Changes required. |
Prioritization | Priority value of the building at the time of submission, if this field exists. |
The detail of a submission shows its periods and amounts, the Submission timeline (type, calculated or hardcoded number of approvals, thresholds applied, documents) and the Approval thread: each level with its approver, its decision (Approved, Declined, Pending), its date and its comment.
Cancel a submission
The button Cancel submission is offered as long as no approver has made a decision. The confirmation “Are you sure you want to cancel the submission?” offers:
Yes and send e-mail notification: cancels and notifies the expected approvers and the submitter;
Yes: cancels without e-mail;
No: changes nothing.

From the request to the CAPEX
The CAPEX is created automatically when the request goes to Approved: on the last approval, or on submission if no level is required. There is no create button. A message confirms it: “A CAPEX was created from this investment request.”
What the CAPEX takes over from the request
CAPEX | Comes from the request |
Name, description | Operation label; detailed description followed by the comments. |
Amount | Amount (excl. tax). |
Dates and schedule | Start = first split year, end = end of the last one; each yearly amount is split equally over the four quarters of the year. |
Category, units | Nature / detailed category, units. |
Recoverability, ESG, taxonomy | Recoverability percentage, ESG, taxonomy. |
Items split | Items copied to the CAPEX. |
The CAPEX is flagged as coming from a request. It starts in the Plan status and then follows its own approval workflow.
See the dedicated procedure for more information: CAPEX / Works
One request, one CAPEX
A request creates a single CAPEX. If it is moved back to draft, edited and approved again, the same CAPEX is updated (amount, dates, schedule, items…): “Capex data has been updated.”
Between two approvals, the CAPEX lives independently: a change to the CAPEX does not feed back into the request, and a change to the request only flows down to the CAPEX at its next approval.
In the list of requests, the Works, Works status and Works amount (excl. tax) columns follow the CAPEX.
See the dedicated procedure for more information: Capex replanning

Move to draft, drop, delete
Move to draft
On a request Approved or Dropped, Move to draft reopens it, after confirmation “Are you sure to move back this request to draft?”.
From Approved: the request becomes editable again and can be submitted again; the existing CAPEX is not modified until it is approved again.
From Dropped: the date, the reason and the drop information are cleared.
Drop a request
Drop the CAPEX request (statuses Draft, Submitted or Approved) opens the Drop of a CAPEX request window:
Field | Entry |
Decision date * | Today's date by default; no future date. |
Drop reason | List configured per environment, optional. |
Additional information | Free text. |
The request goes to Dropped; its detail page shows a Drop information section. A submission in progress is deleted and the request leaves the lists to approve.
Delete a request
Remove the request permanently deletes the request, after confirmation “Are you sure you want to delete this request ? This action can't be undone.”. It is available on a Draft; the superuser can delete a request whatever its status.

Activities, alerts and e-mails
Activities tab and activities pane
The Activities tab groups the requests of all buildings:
CAPEX requests I can approve: columns Building, Name, Issuer, Approver; an expanded row offers Approve the request and Request changes.
Requests pending approval, recently created, recently rejected, recently approved.
The activities pane (on the right) shows a CAPEX requests group with the requests you can approve.
Workflow e-mails
Event | Recipients |
Submission or approval of a level, other levels remaining | Approvers of the next level; matrix subscribers for this level. |
Each decision (approval, rejection, final approval) | The submitter. |
Final approval or rejection | Level 1 matrix subscribers. |
Submission cancellation “Yes and send e-mail notification” | Expected approvers and submitter. |
The e-mail contains a direct link to the detail page of the request.
Configuration and rights
Preferences
Preference | Role | Value |
| Enables the module: building tab, activities, CAPEX request matrices in the administration. | Yes / no (no by default) |
| Allows hardcoding the number of approvals on submission (tenant program category). | Yes / no (no by default) |
| Turns off the e-mails of the request workflow (per-user setting). | Yes / no (no by default) |
| Display duration of recently approved and dropped requests in the activities. | In months (4 by default) |
Configurable lists
Equipment obsolescence, submission types, drop reasons, split items and categories are lists configured per environment.
Rights
Action | Required right |
View the tab and the detail pages | View CAPEX requests. |
Create, edit, submit, drop, move to draft, delete a draft | Modification of CAPEX requests, on a staff account. |
Approve, request changes | Be the approver of the expected level in the building's matrix. |
Delete a request whatever its status | Superuser. |
Delete an item from the split | Modification of CAPEX. |