Overview
CAPEX replanning lets you carry over all or part of a CAPEX plan from one period to the next when a project slips, taking into account the committed amounts and actuals.
What replanning covers
A planning table, by year or by quarter, showing the plan, the approved amount, the committed amount and the actuals for each CAPEX.
The carry-over of the plan from a source period to the next period, CAPEX by CAPEX or in bulk, with a simulation before applying.
Eight carry-over methods, some of which are based on commitments and actuals.
Campaign tracking: state of each CAPEX (To process, Ongoing, Completed, Ignored), amount carried over, History, Reset.
Traceability: each carry-over writes an automatic comment on the CAPEX.

The Planning table
The Planning table is the starting screen for any replanning. It is read period by period.
Where to find it?
From the building: tab Works, then the toggle button Planning (next to Works).
From the CAPEX consolidated view: block Display, option Planning (instead of Consolidated CAPEX), on the buildings searched.
From the Works view of the building: the replanning button of a row directly opens the replanning panel of that CAPEX.
Reading the table
For each period, four amounts are displayed, with the same color code as the replanning panel:
Amount | Color | Meaning |
Plan | Black | Amount planned for the period: this is the amount that replanning moves. |
Approved | Blue | Portion approved by the latest approved submission of the CAPEX, split by period. A carry-over does not move it. |
Committed | Purple | Commitments attached to the period of their Issue date. |
Actuals | Green | Invoices and actuals for the period. |
Columns: Project (clickable, opens the CAPEX record), Code, Nature, Building (consolidated view), State, Last amount change (edit, replanning or shift), Cumulative before and Cumulative after (cumulative plan before and after the displayed periods), then the periods. A bubble opens the comments of the CAPEX. A Total plan row remains visible at the bottom of the screen.
Columns can be sorted and filtered. The commitments of each CAPEX can be expanded ("+" on the row, or "+" in the header for all CAPEXs), with a line "Actuals outside commitments" for actuals not linked to a commitment.
Display parameters
The gear icon Display parameters sets:
Years displayed: a timeline lets you choose the years. By default, four years starting from the year of the building's latest actuals date (in the consolidated view, or if the building has no actuals date, starting from the previous year); the timeline lets you display up to 10.
Columns: check boxes, button Reset columns, generic CAPEX fields. These choices are remembered in the browser.
The level is chosen with the buttons Quarterly / Yearly, below the table, on the right.

Tracking a replanning campaign
Above the table, the Replanning banner tracks the progress of the current campaign: how many CAPEXs have been processed and for what amount.
The banner
A progress bar and the text "X / Y CAPEXs processed".
"Last CAPEX plan submission: date".
Four clickable KPIs that filter the table by state; a second click on the active KPI displays all CAPEXs again.
The total Carried over, by currency.
The buttons History (n) and Reset.
CAPEX states
State | Color | When? |
To process | Yellow | Default state and after a reset. |
Ongoing | Blue | As soon as a carry-over is applied to the CAPEX. A new carry-over brings an Completed or Ignored CAPEX back to Ongoing. |
Completed | Green | Set manually once the CAPEX has been replanned. |
Ignored | Red | Set manually (or by Ignore). The CAPEX is removed from the Carried over total and from the History; if a carry-over had already been applied, the plan remains modified. |
Not replannable | Grey | Completed, dropped or locked CAPEX. |
The state badge is displayed under the project name, in the Replanning column. It is clickable: a menu offers Ongoing, Completed and Ignored.
History
The History button opens a side panel that lists, period by period, each plan rewrite since the last reset: CAPEX, method, author, date and difference (+ / −). In the consolidated view, a collapsible block per building presents its own processed CAPEXs, its latest CAPEX plan submission date, its carried-over amount and its Reset.
Reset
The Reset button opens the Reset the replanning window: "Reset the replanning states? The 'ongoing', 'completed' and 'ignored' replanning states will be cleared.", with the answers Yes / No. It is inactive as long as no CAPEX has been processed. After confirmation, all CAPEXs go back to To process and the total Carried over and the History start again from zero, for a new campaign.
View | Who can reset? | Scope |
Building | Users who have the right to modify CAPEXs | The CAPEXs of the building |
Consolidated | Superuser only | The buildings selected in the consolidated view (the others remain unchanged) |

Replan a CAPEX
Open a CAPEX in the replanning panel: click the replanning icon on its row, or check a single row then click Replan.
The steps
1. Choose the Level (Yearly or Quarterly, taken from the table), then the Source year (or the Source quarter). The target is always the next period: the panel shows it ("Carry-over to the next period: X").
2. Choose the method in the Action list and enter the amount X if the method requires it. The methods are detailed in the next step.
3. If the method is based on commitments, check the commitment checkboxes (displayed when replanning a single CAPEX). With Carry over invoices to be received, uncheck a commitment to exclude it from the carry-over; with Carry over plan – committed and Carry over plan – actuals, a checked commitment stays on the source period and an unchecked commitment is carried over.
4. Read the Current state & impact block: before → after by period, amount moved ("removed from" / "added to") and the mention "Total PPA unchanged".
5. Click Apply: the carry-over is recorded immediately.
Processing CAPEXs in sequence
Opening a CAPEX from the building view starts a queue with all the other CAPEXs in state To process, in the table display order (sorts and filters included). The counter "CAPEX 3 / 12 to replan" shows the position in the queue.
Button | Effect |
Apply | Records the carry-over; the CAPEX moves to Ongoing. |
Apply → next | Records the carry-over, then opens the next CAPEX to process. |
Ignore | The CAPEX moves to Ignored, its plan remains unchanged. |
Ignore → next | Same, then opens the next CAPEX to process. |
Previous CAPEX / Next CAPEX | Navigation arrows in the queue, without applying anything. |

Carry-over methods
The method is chosen from the Action drop-down list. For a given source period, the method determines the amount that goes to the next period.
Method | Code | Amount carried over to the next period |
Manual plan editing |
| No carry-over calculated: plan amounts are entered period by period. The only method that can change the plan total. |
Carry over the whole CAPEX to the next period |
| The whole plan of the source period. |
Carry over plan – committed |
| Plan of the source period − committed amount of the checked commitments: the portion not yet committed. Checked commitments stay on the source period. |
Carry over invoices to be received on issued commitments |
| Committed − actuals, on the checked commitments: the committed amount not yet invoiced. |
Carry over plan – actuals |
| Plan of the source period − checked actuals (commitments and actuals outside commitments): everything not yet invoiced. Checked actuals stay on the source period. |
Carry over all amounts by +1 year, period by period |
| Each plan amount shifts by one year, period by period, including to a year outside the displayed years. |
Carry over an amount X |
| The amount X entered. X cannot exceed the amount available in the source period (message "the amount cannot exceed the available amount"). |
Keep X, carry over the remainder |
| Plan of the source period − X: X is kept on the source period. |
When is a method offered?
Plan – committed and Invoices to be received are only offered if the CAPEX has committed amounts.
Plan – actuals is only offered if there are actuals.
Keep X, carry over the remainder is always last in the list.
The
capexReplanMethodspreference restricts the list to the codes above that it contains; without it, all methods are offered.Manual plan editing is refused on a snapshot and on a Stress Test.
The available carry-over methods can be enabled or not.
If only Carry over everything to the next period interests you, for example, it is possible to display only that option.

Replan in bulk
To process several CAPEXs at once, check their rows then click Replan (active as soon as a row is checked). The panel is then titled "Replan in bulk — N selected row(s)".
The steps
1. Check the CAPEXs in the table (building or consolidated view).
2. Click Replan, choose the level and the source period.
3. Choose the method in Action.
4. Read the impact block, then click Apply.
Methods offered in bulk
Method | In bulk |
Carry over the whole CAPEX to the next period | Yes, with simulation |
Carry over plan – committed | Yes |
Carry over invoices to be received | Yes |
Carry over plan – actuals | Yes |
Carry over all amounts by +1 year | Yes, applied without simulation |
Manual plan editing, Carry over an amount X, Keep X | No: to be done CAPEX by CAPEX |

Checks and impossible carry-overs
A carry-over that would make the plan negative in at least one period is impossible: the panel displays "Carry-over impossible" with the detail "the operation would make the plan negative in at least one period. Adjust the amount, the method or the source period." and the list "Problematic periods: …". The Apply button is disabled.
In yearly mode, the Problematic periods list indicates the source year.
An orange message, on the contrary, shows the amount moved: the carry-over is possible.
Negative plan rule
Level | The check applies to | Consequence |
Yearly | The plan for the year | A committed or remaining-to-invoice amount higher than the plan of a quarter but covered by the plan for the year does not block: amounts are re-spread. |
Quarterly | The plan of each quarter | The check is blocking at quarter level: the plan split must be consistent with the committed amounts and actuals of each quarter. |
Yearly, Plan – committed and Plan – actuals | The retained amount (committed or actuals) compared with the plan of the source year | If the retained amount exceeds the plan of the source year, the carry-over is blocked: first modify the plan with Manual plan editing. |
Yearly, Invoices to be received | Invoices to be received (committed − actuals) compared with the plan of the source year | Blocked if they are negative or higher than the plan of the source year. |
Example
Plan of €300,000 for 2026 (€75,000 per quarter), committed amount of €250,000 ordered in Q1, actuals of €50,000.
In yearly mode, Carry over invoices to be received moves €200,000: 2026 goes from €300,000 to €100,000, 2027 from €0 to €200,000.
In yearly mode, Carry over plan – committed moves €50,000: 2026 goes from €300,000 to €250,000.
In quarterly mode, from Q1 to Q2: carry-over impossible, Q1 would drop to €75,000 − €200,000 = −€125,000.
Statuses and locks
CAPEX | Replanning |
Plan, Submitted, Approved, Refused | Possible |
Dropped, Completed | Impossible (row cannot be selected) |
Locked | Impossible: tooltip "CAPEX locked: it cannot be replanned" |

Commitments and actuals
The methods Plan – committed, Invoices to be received and Plan – actuals work commitment by commitment.
Commitment details in the panel
One row per commitment, with its committed amount and the associated actuals, as in the CAPEX table.
For the three methods above, each row has a checkbox (everything is checked by default), only when replanning a single CAPEX: in bulk, there are no checkboxes and everything stays on the source period. With Invoices to be received, unchecking a commitment removes it from the carry-over. With Plan – committed and Plan – actuals, unchecking a commitment (or the actuals outside commitments) carries it over with the rest of the plan.
For the other methods, the details are read-only.
The actuals not linked to a commitment are displayed on a separate row, in the table as in the panel ("Actuals outside commitments").
Assignment to periods
A commitment is counted in the period of its Issue date, whatever its duration.
Actuals are counted in the period of their own date.
In yearly mode, these amounts are grouped by year; in quarterly mode, by quarter.
Calculation | Formula |
Plan – committed | Plan of the period − committed amount of the checked commitments |
Invoices to be received | Committed − actuals (checked commitments) |
Plan – actuals | Plan of the period − checked actuals |

Traceability of carry-overs
Each carry-over applied automatically writes a comment on the CAPEX. It is visible through the comments bubble of the row, from the building as well as from the consolidated view.
Content of the comment
A title "Replanning (automatic entry)", or "Plan shift (automatic entry)" for the +1 year method.
The author, the date and the time.
The method, the source period and the target period.
The view used (Yearly view or Quarterly view).
The amount moved, and the Amount X for Carry over an amount X and Keep X.
The list of Commitments carried over, and whether the actuals outside commitments are carried over or kept.
For replanning, a Period / Before / After table. For shifting the entire plan by +1 year, the shift rule, the number of payments moved and the period codes, without a before/after amounts table.
Other traces
The Last amount change column of the Planning table.
History of the tracking banner (step "Tracking a replanning campaign").
The action log of the CAPEX, which records the method used.
Configuration and rights summary
Preferences
Preference | Role | Value |
| Enables the Planning view and CAPEX replanning. | Yes / no (no by default) |
| Limits the carry-over methods offered. | JSON list of codes: |
| Enables CAPEX locking by users. A locked CAPEX cannot be replanned. | Yes / no |
| Locks at creation a CAPEX that carries an external code. | Yes / no |
| Blocks modifications to CAPEXs of a building when a CAPEX has entered the approval workflow, except for superusers and approvers. | Yes / no |
Example value of capexReplanMethods: ["shiftAll", "planEngaged", "far"]. With this value, only these three methods are offered; a method absent from the list is refused when the carry-over is saved.
Rights
Action | Required right |
View the Planning view | Access to CAPEXs |
Replan in building view | Right to modify CAPEXs |
Replan in consolidated view | Right to modify CAPEXs and the CAPEX consolidated view |
Reset in building view | Right to modify CAPEXs |
Reset in consolidated view | Superuser |
Without the modification right, the table is read-only: the Replan button is hidden. To replan in consolidated view, both the right to modify CAPEXs and the right on the CAPEX consolidated view are required.
CAPEX locks
To fit the different approval processes, CAPEX locking functions exist (for example, blocking the editing of amounts as soon as a CAPEX is approved). A locked CAPEX cannot be replanned. With lockCapexModificationsOnSubmitYN, CAPEX modifications are also blocked as soon as a CAPEX of the building has entered the approval workflow: only superusers and approvers can then replan, others receive a blocking message when applying. Contact your usual contact to enable them.
Please find attached the PDF version of the user guide: